Application: designed for fire preventive insulation of passages:
- flammable pipes,
- steel and copper pipes isolated with synthetic foam cover, through separations of fire division.
Installation:
- in walls - one band in the wall axis,
- in floors - one band inside the floor should be placed 1 cm above the bottom floor edge. Free spaces between the band and the wall (floor) should be filled with a cement or plaster grout. Detailed rules of installation and range of applications are defined in the Technical Approval.
In order to undergo training and obtain a Contractor Licence, one has to contact representatives of Niczuk Metall-PL.